Termco
Blog

Paper tickets, billing, and the money in between.

Practical writing for operators who still run on paper: where tickets go missing, how billing errors hide, and what auditing them actually looks like.

October 03, 2026 ยท Latest post

Ton 25,001

Volume tier pricing flips at a threshold only a running total can see. Nobody keys a running total, so the tier flips wherever the argument lands.

Read post

October 02, 2026

It Snowed More Than You Billed

Per-push snow work happens at 3am and gets billed from a route sheet written at dawn. By the spring audit, the evidence has melted.

Read post

October 01, 2026

Cost Plus Nothing

Disposal billed at cost plus 15% sounds leakproof. You pay on the facility's ticket stack and rebill on your match, and every orphan ticket is pure loss.

Read post

September 30, 2026

MISC Is Not a Product

Every billing system has a catch-all code. A MISC line prices from nobody's rule, repeats at nobody's rate, and leaks a little every time it's keyed.

Read post

September 29, 2026

Ninety Minutes of Free Rock

When the scale system goes down, the trucks keep rolling. What leaves the gate during an outage is the purest revenue leak you have.

Read post

September 28, 2026

The Rent Nobody Invoices

Grain storage is rent that accrues from each ticket's date. Billed once at settlement, it shows up months old and easy to knock down at the counter.

Read post

September 27, 2026

Payroll Never Loses an Hour

Every hour a tech works lands in payroll, because he checks his stub. Whether it lands on an invoice depends on a ticket nobody audits.

Read post

September 26, 2026

You Hauled the Water

A grain ticket carries the farmer's settlement numbers. A hauling invoice keyed from post-shrink bushels gives away the water your trucks moved.

Read post

September 25, 2026

The Brake Job the Contract Ate

Flat-rate maintenance contracts make covered the default on every work order line. The repairs that slide under the rate never bill.

Read post

September 24, 2026

The Zone That Rides the Account

Delivered pricing runs on a zone somebody keyed at account setup. Every job since inherits it, and the gap between keyed miles and road miles never bills.

Read post

September 23, 2026

Wrong Rock, Right Weight

When the bunker runs empty, the loader substitutes and the ticket doesn't. The product field is the only line on a scale ticket nobody measures.

Read post

September 22, 2026

The Pile With Your Customer's Name on It

A dedicated stockpile on pay-on-removal terms turns crushed tons into a loan. The tons that never haul out never print a ticket, so they never bill.

Read post

September 21, 2026

The Footnote Nobody Keys

Minimum charges and small load fees live in your rate sheet's footnotes. A footnote is a billing rule with a condition, and keying drops conditions first.

Read post

September 20, 2026

The Clerk Who Never Makes Mistakes

The quietest billing offices usually run on one veteran clerk repairing tickets from memory. Her two weeks off will show you your real error rate.

Read post

September 19, 2026

The Load That Arrives Full

Outbound loads print tickets. Inbound loads that owe you tipping fees mostly don't, and a billable event is billable in both directions.

Read post

September 18, 2026

Diesel Moved and Your Invoice Didn't

A fuel surcharge is a weekly formula tied to a published index. Run it from a sticky note and it quietly becomes a flat number one side chose.

Read post

September 17, 2026

The Pit With No Scale

A satellite pit that sells by the load runs its billing on a grease pencil tally. A mark that never lands is a load you hauled for free.

Read post

September 16, 2026

The Tare You Set in March

On a per-ton ticket the gross is measured and the tare is remembered. A stored tare that drifted quietly reprices every load that truck hauls.

Read post

September 15, 2026

The Shelf Life of a Broken Ticket

A parked ticket is finished work waiting on one missing fact, and that fact decays fast. Date the tray, work it newest first, count what it costs.

Read post

September 14, 2026

Nobody Bills the Weekend

Weekend loads get recorded once, by whoever is at the scale, and keyed Monday from memory. That gap is where missing and doubled tickets cluster.

Read post

September 13, 2026

Trade Work Still Prints Tickets

A handshake trade between two operations still prints scale tickets on both sides. Settle it from memory and one of you funds the gap.

Read post

September 12, 2026

The Most Expensive Checkbox in the Building

A tax exempt flag keyed once at account setup decides money on every invoice after. When the certificate behind it expires, the bill comes to you.

Read post

September 11, 2026

Two Loads That Look Like One

Two similar tickets on one invoice read as a duplicate. Whether you keep the money depends on whether your paper can prove the second load ran.

Read post

September 10, 2026

The Discount Was a Loan

A committed-volume rate prices every ticket as if the tons will come, and when the season ends short, nobody counts and the discount turns permanent.

Read post

September 09, 2026

You Can't Collect What You Can't Find

A short-pay is a retrieval test. Whatever your filing system can produce is what you collect on that invoice, and the rest gets credited.

Read post

September 08, 2026

The Load You Sold Yourself

Company use is the one job code with no invoice behind it and no reader on either side. Billable loads keyed there vanish without a trace.

Read post

September 07, 2026

The Truck Got Paid Either Way

A hired truck's settlement is a load count with a motivated auditor behind it. Your invoices should match it, and most operations never check.

Read post

September 06, 2026

Same Ticket, Two Totals

Hand one haul ticket to two clerks and you can get two different invoice totals, both defensible. The rules live in heads, and heads differ.

Read post

September 05, 2026

The Hose Was Free, the Labor Wasn't

Field service trucks carry a parts store in the side boxes. What comes out of them bills only if the tech writes it down, and plenty never gets written.

Read post

September 04, 2026

Half This Load Goes Across the Road

A split load turns one ticket into two billable events. The margin note that records the split overbills one customer and forgets the other.

Read post

September 03, 2026

Rejected, Not Disputed

An invoice AP disagrees with gets a phone call. One that fails PO match gets a status. The second kind ages in silence, and part of it never pays.

Read post

September 02, 2026

Paid at the Window, Billed to Nobody

Cash sales feel finished the moment the money changes hands. That makes the cash lane the least reviewed paper in the operation, and it leaks.

Read post

September 01, 2026

The Radio Is Not a Rate Sheet

Mid-job price changes get agreed by phone and honored by everyone except the invoice. A spoken rate that never reaches billing bills at the old one.

Read post

August 31, 2026

The Month Ends Before the Tickets Do

Invoices go out on the 2nd. Tickets from the 30th are still in trucks. That seam decides whether those tickets bill twice, once, or never.

Read post

August 30, 2026

Count Your Ticket Books Like Cash

Blank ticket books leave the office with nobody logging which serials went where. A book lost in a truck is billed work you cannot even see missing.

Read post

August 29, 2026

Quoted by the Job, Leaked by the Load

A lump sum quote is built from a load count. When the real count runs past the estimate and nobody compares, the overage hauls free.

Read post

August 28, 2026

A Voided Ticket Is Still a Ticket

Every void at the scale leaves two tickets describing one load. Unrecorded, the extra one bills twice or burns the audit that counts your tickets.

Read post

August 27, 2026

No Charge, No Questions

Every operation needs a no-charge code. Unguarded, it turns into a discount nobody approves, on tickets no report totals and no customer reviews.

Read post

August 26, 2026

When the Other Side Writes the Ticket

Broker tallies, destination weights, and elevator grain tickets are billing records your counterparty controls. That control has a price.

Read post

August 25, 2026

Two Spellings, Two Prices

When one customer lives in your system as two records, the negotiated terms fork, and each ticket bills at whichever copy the clerk picks.

Read post

August 21, 2026

Every Credit Memo Has a Silent Twin

Credit memos document the billing errors customers caught. The same processes that overbill also underbill, and nobody calls about those.

Read post

August 20, 2026

Detention Time Never Prints a Ticket

Tonnage gets billed because the scale forces a record. Detention, tarp fees, and second stops have no machine behind them, so they leak.

Read post

August 19, 2026

The Ticket Says Tons, the Contract Says Yards

When tickets weigh in one unit and contracts price in another, the conversion factor becomes a rate nobody manages. That's where the money moves.

Read post

August 18, 2026

Your Best Month Is Your Leakiest Month

Ticket leakage concentrates in peak weeks, when volume spikes and back-office attention collapses. A record month is where the misses hide.

Read post

August 17, 2026

Your Rate Sheet Has a Date on It

Every ticket should bill at the rate in force on its date. Escalators nobody invoked and rate sheets nobody retired are where that fails.

Read post

August 17, 2026

One Pricing Clause, Two Invoices

A tiered pricing sentence has two defensible readings that differ by a fifth. Your billing config picked one of them. The contract may not agree.

Read post

August 17, 2026

Map the Path a Ticket Takes From the Field to the Invoice

Draw the route your tickets travel from the field to the invoice, and you will usually find the exact spots where revenue leaks.

Read post

August 17, 2026

The Scale House Handoff Is Where Quarry Revenue Goes Missing

Most aggregate ticket leakage happens between the scale house and billing, not at the scale itself. Here is how to audit it.

Read post

Put the ideas to work on your own tickets.